The Project for Reconstruction of Schools in Flood and Land Slide Affected Areas,
Basic Education State Middle School, Aung Daing Village, Sittwe Township, Rakhine State
Inspection |
Inspection For Construction |
Inspection For Roof Beam |
Inspection For Roof Beam |
Inspection For Roof Beam |
Inspection For Roof Beam |
Compact for Soil |
Slump Test for Roof Beam |
Concrete mold for Roof Beam |
Concrete mold for Roof Beam |
Concretion work for Roof Beam |
Inspection for Roof Beam |
Check Thickness of U Beam bottom Tie |
Check Thickness of U Beam bottom Tie |
Check Width of U Beam bottom Tie |
Truss Production Work For Roof Beam |
Truss Installation Work |
Truss Installation Work |
Check Thickness for Lip Channel Purlin |
Check 0.36mmThk; 4 angle colour sheet |
Check 0.36mmThk; colour plain sheet |
Concrete Block & Brick Work For Wall |
Concrete Block Work |
Concrete Block Work |
Precast Drain Cover work |
Door & Window Arrived to Site |
Check Thickness for Door Leaf |
Check Dimension for Door Leaf |
Check 5”x2”Chocket for Window |
Check 5”x2”Chocket for Window |
Check 5”x2”Chocket Size for Window Frame |
Check 5”x2”Chocket Size for Window Frame |
Check Thickness for Window Leaf |
Check Dimension for Window Leaf |
Site Survey Work |
Curing work for wall |
Yangon-Mandalay Railway Improvement Project 2020-2023
Concrete Sleeper Production Recorded Photos
Safe Drinking Water Supply Project,2014 |
Safe Drinking Water Supply Project,2014 |
Accessment on Pond Rehabilitation in 15 Villages Project,2011 |
Accessment on Pond Rehabilitation in 15 Villages Project,2011 |
Kokang Project,2003 |
Kokang Project,2003 |